thats right folks the damn hand runs! after two full days of hydraulic plumbing and a little electrical work we put it through series of movement tests. The last two days consisted of Christian and I pulling high pressure steel hydraulic lines out of the building and converting them using hydraulic ferals and nuts to extend each ram on the fingers. The bottom line, we built this machine in 10 days, with junk salavaged from local sources, Doyle, Conrad, Christian and I arrived in holland with suit cases with noting more than clothing and small personal items ( no tools or parts).
This has been an intense leason in fabricaton from nothing to create something totally off the hook. These new images are from last nights test. Enjoy
